I attached the scope of work here for you, there are 3 welding works involved
• Cut and weld 2 of 4” Duplex pipes + RT + Hydrotest + Leak test
• Weld 4 of the steel blocks for skid base
• 4 locations of Deck penetration
All the material is supplied by CPOC, scaffold is assist by CPOC team. You have to prepare the welding consumables and pressurized habitat + some of scaffold for the habitat.
The tentative date prepare the habitat is ~4th September and the work start on 10th September (to be discussed).
Now, if you want to send a survey man, please let me know. Please also prepare the workpack and JSA krab.
Call me for any questions via 02-537-7512. And please give me your number then I can explain krab. Thank you very much krab.
Sincerely,
Schach Nokjib