This refers to the clarification about the scope of supply of 2 new loading arms for this project and the 3rd (future) loading arms.
FMC foreseen the material for the kit of modification for 2 loading arms.
The necessary additional material for the 3 (future loading arms) should be included in the project relative for the 3rd new loading arm