We will explain about the Synchronized production method.
While spindle head and turret are assembled, NC Panel and electrical cabinet are assembled.
The units are transferred to the A line and the Module Assembly line respectively and simultaneously.
By synchronized those different processes, the floor lead time can be drastically reduced.