Notes :-
The Contractor shall refer to the Schedule of Finishes in the Tender Drawings and Specifications.
The works shall include all preparatory works, screed, skirting, drops, kerbs and finishes to floor surfaces including dividing strips and finishes to steps.
The Contractor shall be responsible to ensure that the total thickness of the floor finish including any screed or bed shall be such as to bring the finished floor to the levels required. Adjoining finishes, including those to falls, shall finish at same level at doors and openings where applicable.
The Contractor shall allow for finishing to falls and crossfalls to all wet areas, providing expansion joints, grooves, drops and the like to the specified finishes. The Contractor shall allow for laying tiles to patterns and borders as required.
The Contractor shall allow in his prices for forming, finishing to and working around scupper drains, floor traps, etc.
At all junctions of different floor finishes, provide for brass or other equal and approved dividing strips set in cement and sand and finished flush with floor finishes.