Where non-metallic conduit is used, stub-ups shall be made by using a metallic elbow,coupling and extension nipple.The transition to metallic conduit shall be made underground using an approved adapter. All sleeve joints shall be cemented for waterproofing. Concrete encasement shall extend a minimum of 150 mm above grade.