- These are the ratios of the times spent in each development phase.
- Thus, the DLD/code ratio is the ratio of the time spent in detailed design to the time spent in coding a program.
- Calculate the planned and actual ratios from the SUMP date.
- When the denominator phase values are 0, enter "inf."