The critical sizes obtained are then compared to those
defined in step (e). If they are bigger than these, actions
(repair, substitution . . . ) are required. If not, the analysis has
to consider the possible subcritical crack propagation caused
by the variable stresses acting on the tower (step (h)) or other
mechanisms (step (i)).