High-pressure tubing certified for continuous operation
at 60,000 psi (4082 bar) is required for routing
high-pressure water from the intensifier to the
attenuator, and from the attenuator to the rear
bulkhead fitting. The same type of tubing also connects
the 7X pump to the cutting equipment.
Fabricating the tubing and connecting the intensifier
pump to the cutting equipment is part of the
customer's installation responsibilities. If you need
assistance, contact the Technical Service
Department.
• Refer to manual M-127, Small High-Pressure
Components, for more information on highpressure
tubing, components, and related
service.