Please copy attached sheet in Stay Pipe schedule excel file.
These pieces are for FCB accessories.
We should start producing first normal pipes with rib.
First Ø315 inside Ø280 or 250, and inside Ø225 or Ø200
So we have to start with bigger diameter and keep putting pieces inside
Best way to keep material it is in containers. So, once, backyard is with concrete, we have to ask for at least 4 containers of 40” to be on the floor and keep loading them as specifications. Once 4 containers are full we have to change diameter and keep doing nesting inside big pipes
Any doubt, we talk tomorrow or during my holiday at any time.
Best regards,
David