b. If the direct labor hour method is used in applying factory
overhead and the predetermined rate is $10 an hour, what
amount should be charged to 2010 for factory overhead?
Assume that the direct materials used totaled $5,000, the
direct labor cost totaled $3,200, and the number of direct
labor hours totaled 250.