1.0 PURPOSE
To set standards to which scaffolds will be erected and dismantled using sound materials and to set further standards for their safe use and inspection a specific periods. It should be noted that unsheathed scaffolding above 50 m in height and sheeted scaffolds in very exposed positions need to be specially designed.