BOI Software requirement;
1 BOI IMPORT DATA BASE
1.1 Interface all BOI material lists (BOI max stock) including
Material number into the systems (Included BOI group number)
1.2 Interface all import data into the systems
- Import invoice (material information)
- Input LOT number reference, project reference
- Input Customs entry number for import reference
- Input Shipment/Invoice number for import reference
2 BOI FORMULAS (Master BOM)
2.1 Interface BOM from multiple excel sheets into the systems to get "Master BOM" with LOT number reference; such as
Door assembly product;
- Commissioning information Interior part (sunblind, door trim, etc)
- IPL Carkit
- Harness for Door assembly
- Semi product (Door trim from JSI)
Wiring harness product;
- Main harness
- Audio harness
- Cockpit harness
- PDC harness
- Frontend harness
- EPS/EAS harness
2.1 Comparison between Master BOM and import invoice and a report is generated for the + or – is given for the invoice
2.2 Master BOM can be edited (Such as; Technical change, etc.) and lot numbers can be added or more items can be added. Detail of all edit and revision is kept as history in systems
2.3 Master BOM can be added BOI group number reference per item
3 FG EXPORT DATA FOR BOI'S CUT STOCK/ADJUST
3.1 Interface sale report data into the systems by using excel files with LOT number reference (ข้อมูลการขาย สามารถไปผูกกับ รายการ Master BOM เพื่อให้ได้ข้อมูลว่าวัตถุดิบที่นำเข้ามีผลิตและส่งออกไป ดัง FG ที่ระบุในรายงานการขาย ว่ามีปริมาณวัตถุดิบที่ส่งออกจำนวนเท่าไร)
3.2 A report is generated material q'ty and contents BOI Group number per item
4 BOI MATERIAL RETURN/EXPORT FOR BOI ADJUST
4.1 Interface material return/export into the systems with shipment/invoice reference
4.2 A report is generated material q'ty and contents BOI Group number per item
5 SCRAP DATA FOR BOI ADJUST
5.1 Interface scrap information into the systems with shipment/invoice reference
5.2 Comparison between scrap information with BOI import data base (as item 1), A report is generated for the + or – and false for items
6 BOI MATERIAL BALANCING
Systems need to generated real time report BOI's material balancing (BOI Group no. need to be contents in a report