o Fire pump performance tests should be conducted annually to ensure that the pump can effectively operate during the fire situation. The test shall be conducted under minimum, rated, and peak flows (150% rated flow) of the fire pump by controlling the quantity of water discharged through approved test devices in accordance with NFPA25.