1. Location of the scaffolding is erection.
2. Reference number of scaffolding.
3. Date scaffolding is complete.
4.Applicant to install scaffolding. (For the safety of the scaffolding. The installation of scaffolding, scaffolding must be installed by the team. So if you want to support scaffolding operations. Request must be installed to
install scaffolding The team installed the scaffolding was installed).
5. Signature Control installation scaffold. And supervisors set of scaffolding assigned to responsible (Should the security officers to work share with signed approval. After checking with scaffolding).
6.Ability support the weight of the scaffold. It is a overview indication the sign of green scaffolding. Posts Try taking to use application.