A package such as R/3 can be customized to take account of different values for the features relating to planning & control described in Section 3.4. Since the software was developed from the MRP II concept, the limitations of usability indicated in Figure 3.5.3.1 also apply. In fact, most of the software packages were developed on the basis of MRP II, so the same restrictions will apply in almost every case.