1 Price does not include the crane in front of the building blocks that could be installed quickly by car, skip it.
2 tenants will be prepared and placed in restraints. Including trails and roads, as well as the delivery is made.
3 When the client basement addition to the manufacturer's directions. Due to different soil The company allowed to charge
Repair the damage Caused the water level is not level due to soil conditions have changed.
4, we can deliver ready to use immediately. It does not include the power cord into the building. Or Connect
5, the tenant will need to be grounded because the ground would * not * be fatal.
6 Lessee, provided the cables (and the plumbing if any) to connect the building to order. Before the date of delivery
To test the system (And water) to the date on delivery.
7 the return of quick-install prefabricated buildings for rent. Lessee shall be cut off electricity to the building. (And cut the water supply system, if any).
If the tenant does not conduct electricity cuts. (And water if available), the company would consider cutting costs in the system.
Was 2,000 baht / unit
8 the return of quick-install prefabricated building lease, the tenant must return the premises in the same condition as at the date of delivery of the building.
9, the company can change the product. Including installation If that does not fit or is.
The risk of causing harm to the building.
10 clients who want to move the delivery date, please notify the Company in writing prior to the original delivery 3 working days.
Otherwise, the company is required to charge full price for shipping.
1 Price does not include the crane in front of the building blocks that could be installed quickly by car, skip it.
2 tenants will be prepared and placed in restraints. Including trails and roads, as well as the delivery is made.
3 When the client basement addition to the manufacturer's directions. Due to different soil The company allowed to charge
Repair the damage Caused the water level is not level due to soil conditions have changed.
4, we can deliver ready to use immediately. It does not include the power cord into the building. Or Connect
5, the tenant will need to be grounded because the ground would * not * be fatal.
6 Lessee, provided the cables (and the plumbing if any) to connect the building to order. Before the date of delivery
To test the system (And water) to the date on delivery.
7 the return of quick-install prefabricated buildings for rent. Lessee shall be cut off electricity to the building. (And cut the water supply system, if any).
If the tenant does not conduct electricity cuts. (And water if available), the company would consider cutting costs in the system.
Was 2,000 baht / unit
8 the return of quick-install prefabricated building lease, the tenant must return the premises in the same condition as at the date of delivery of the building.
9, the company can change the product. Including installation If that does not fit or is.
The risk of causing harm to the building.
10 clients who want to move the delivery date, please notify the Company in writing prior to the original delivery 3 working days.
Otherwise, the company is required to charge full price for shipping.
การแปล กรุณารอสักครู่..