34.2.3 Procedure During Bunkering
a) The Chief Engineer is to ensure that delivery rate of bunker does not exceed the agreed rate.
b) Bunker tanks which have been topped up should be checked frequently during the remain loading operations to avoid an overflow
c) The Chief Officer to ensure the particular attention to mooring tenders.
d) Bunkers tanks which have been completed and closing should be double checked that no further increasing in the sounding level.
To ensure that appropriated valves are properly closed without any mistake
e) Three Engineers will be required to be duty for bunkering operation. assigned for the duty as
i) Chief Engineer overall in-charge of bunkering operation.
Ii ) 2nd Engineer o supervise & control the bunkering operation and 11 communication between ship and shore