CONTRACTOR shall verify and provide a connection such a piping work and electrical cable work from battery limit (B.L.) or interface point at the laboratory room and injection molding machine room boundary such as electrical feeder, nitrogen gas, instrument air, potable water, demineralized water, fume gas and drainage system to the machine itself for unit operation.