12.4 Design and Development Inputs
12.4.1 General outline
ISO/TS16949 Quality management their confirmation prior to design study during concept design or each phase. (ISO/TS16949 : 7.3.2.1 "production design input")
In (HIAMS)Gr. this process has been established as SASG:K10-06A "Design and Development Inputs" and this SASG is in operation.