The visualization in Fig. 1 contains a lot of data per issue. The two circles at point #1 in the figure show the time when the issue was started working on and then completed. Point #2 shows the time when the issue was installed to the test environment and point #3 shows the event when the task was ready for production. The task was then later installed to the production among other tasks. Comments are drawn with small gray bullets.