7.10 If don’t have any stock means assemble the Insert as per drawing.
7.11 For Top Clamp please check the small steps in the drawing and make sure the EDM roughness, If more rough update to QC and reject the job.
7.12 After lapping check the Visual Under Microscope and measure the dimension, Make sure dimensions are as per
drawing if ok Pass to QC for final checking.