After the tendons have been stressed and the excess length of strand trimmed, the ducts are grouted with a neat cement paste or a sand-cement mortar containing suitable admixtures, which bonds the strands to the duct. Sand is not included in the grout for the small diameter ducts normally used in post-tensioned floors