Overall, mean deviation between realized and optimized DP was
−0.28 units while the mean difference for DE was −0.56 MJ and the
mean difference between realized and optimized DE and DP varied between
the feed companies (Table 6). For Companies 1, 2, 4, and 5, the
mean difference between realized and optimized DP was negative indicating
that the optimized values were higher than realized, and the deviation
was the least for Company 1. Company 3 had a positive mean
difference for DP indicating that optimized values were lower than realized.
Mean deviation between realized and optimized DE was negative
for Companies 1, 2, and 3 and the difference was most marginal for
Company 1. Companies 4 and 5 had positive deviation of DE.
Overall, mean deviation between realized and optimized DP was−0.28 units while the mean difference for DE was −0.56 MJ and themean difference between realized and optimized DE and DP varied betweenthe feed companies (Table 6). For Companies 1, 2, 4, and 5, themean difference between realized and optimized DP was negative indicatingthat the optimized values were higher than realized, and the deviationwas the least for Company 1. Company 3 had a positive meandifference for DP indicating that optimized values were lower than realized.Mean deviation between realized and optimized DE was negativefor Companies 1, 2, and 3 and the difference was most marginal forCompany 1. Companies 4 and 5 had positive deviation of DE.
การแปล กรุณารอสักครู่..
