Tubing sand clean out- Provide temporary flow line of NPI-A05,A06 andA07 well
and Provide temporary loading line from storage tank to
truck
- Provide temporary Flow line for support operation at NPI-B site
- POOH sucker rod and down hole pump of SKJ1-1 well for inspection down hole pump.
- Install BOP for well head of NPI-A06 and NPI-A07 well
- Loading and unloading tubing 3-1/2’’ from NPI-B to BKM-B site (Tubing sand clean out)