Thailand : Power generation capacity to be increased to 71 GW in 2030, with a gradual reduction in the share of natural gas and introduction of nuclear power from 2026. Increase the share of renewable energy in final consumption to 25% by 2021. Reduce energy intensity by 25% by 2030, compared with 2005 levels. Increase oil stock to 45 days of net import and consider to expand to expand to 90 days in the longer term.