As per below, we have been appointed to carry out a RightShip inspection on subject vessel o/a 24th July.
Kindly revert with following for our own planning:
- ETA and ETD
- loading condition; empty or laden
- intended anchorage
Kindly forward attached file to vessel's Master for his own preparation for a smooth inspection, as
well as following.
We will require to inspect following ballast tanks, which should be well ventilated prior our attendance:
FPT, APT, one side tank each side.