For economic evaluation, the cold room at capacity 3,000 kg by
using the 10 kW absorption system is also carried out with 10 sets of
cooling per month, 24 hours per freezing set. At the time of assessment
with the construction cost about 20,000 USD and the payback period
is 22 months.