• General report of bored pile work
• Checking record of center point co-ordinate before drilling
• Drilling record borehole
• Checking report of steel cage section
• Checking report of the completed borehole
• Checking report of join rebar cage
• Checking report of installation sonic duct for bored pile testing
• Checking report before concreting pile work
• Concreting record of bored pile
• Checking report of concreting for bored pile
• Report on filling of sonic testing duct by cement grout
• Report on concrete compressive strength test