I. From “Chevron Thailand – Fixed Lifting Equipment Operating Practices” Fixed Lifting Equipment, P. 45, Version Draft: 23-Jun-10.
1. Complicate Lift
2. Complex Lift
3. Hazardous Lift
4. Heavy Lift
5. Man Ridding Work Basket Lift
6. Work done by temporary installed contractor or Company crane
7. Loads requiring the use of a crane to place and hold them in a specific position or location. Exception: The use of crane to place and hold wireline lubricator and BOP on top of well head.
8. Bottled Propane Rack and Tank Lift
9. Any lifts named by management or crane operator due to uniqueness of the lift.