Pilot drift shaft
This is the front most part of the dig in the tunnel. It supported the digging of the main shaft and construction shaft by carefully researching and testing the nature of the soil and the way the sea water seeped through, and then contemplating development and way of excavation.
Now it is used for drainage, and ventilation