Step 1: General check of Components, Material
a. Check all necessary erection tools and materials provided by erection company
Correct work conditions:
1. e.g. cranes, winches, hydraulic jacks
2. welding machines, welding filler material according to WPS (see Appendix: 1 Inspection and Test Plan)
e. Check of FWT foundations, steel structure Conformity to drawings (civil works)
1. Arrangement
2. Levels
3. Dimensions