Install Rest Area and Interlocking Blocks.
Install Siding Frame.
Form Work Roof Beam Utility Area.
Setting PE Conduit to Manhole @Guard House, Rectification Drain Pipe Office.
Safety Control and Document.
Casting Concrete Gutter.
Casting Slab Work.
Line & Level Toilet Office
Re bar Slab Oil Tank & Form Work.
Show DWG & Summery Concrete Document.
Document Work : Payment Oct'2015 & Check Scaffolding Document.