Project Management 1. Overall coordination with COTL
2. Project documentation and document control services
Process 1. Revise P&IDs
2. Provide input to Instrument Data sheets
Piping 1. Revise Post-Drill Piping Layout Drawings (1 drawings)
2. Revise Piping Isometric drawings (4 drawings)
3. Revise Piping MTO (1 document)
4. Provide additional Pipe support drawings (2 drawings)
5. Revise Equipment Layout and Wellhead Orientation Drawings (4 drawings)
6. Revise Post-Drill Piping Layout Drawings (8 drawings)
7. Revise Piping Isometric drawings (45 drawings)
Instrument 1. Provide input to P&IDs
2. Prepare and revise Instrument Data sheets for additional PIT and TIT
3. Revise / Update Instrument Index
4. Revise Instrument MTO
5. Updated Instrument Location Plan
6. Prepare tubing and Cable Schedule
7. Updated Hook-up drawing
8. Updated Wiring Drawings
9. Updated Termination Drawings
10. Updated Loop Diagrams of the PSH/PSL for 15 wells