[20] studied the biodesulphurization of different pyrite forms for Indian coals and found that the coal samples rich in disseminated pyrite have undergone minimum removal, while the maximum removal was observed in samples rich in cavity and fissure filling pyrite The main drawback of biodesulphurization is that the process is slow which takes about 1–2 weeks