The work area shall be cleared and free from obstruction and benchmarks shall be checked in order to ensure that they are ready for use.
All relevant equipment and tools will be mobilized to the work site. All equipment and tools shall be set up. The excavation hole will be pre-drilled to the depth of approximately 1.2 meters.