Based on the data collection in a plastic lens CR39 production line the average production capacity per day (overtime is not included) at some stations does not reach the target of 25,000 pieces per day (1 shift/8 hrs/day) as shown in Figure 4.
It can be seen that the bottleneck processes are the assembly and filling stations. Both departments use process layout by placing different machines in different locations as shown in Figure 5