The degree of free-riding was estimated in the early phase of the VA scheme. A
survey presented by Johannsen and Togeby (1999) showed that 34% of the energy
savings resulting from specific projects would have been realised also without the
VAs. The degree of free-riding has not been estimated since then, but most likely it
is lower since many of the currently participating companies have been committed
to VAs before