the objective of fracturing a horizontal well is to create a system whose long-term performance is identical to that of a single effective, or total, fracture of length equal to the spacing between the outermost fractures (Raghavan et al., 1997, and Chen and Raghavan, 1997). Figure 1.2 provides a sketch of this interpretation.