v) Pre-fabricated pipe spools shall be cleaned by air blowing after pre-fabrication and appropriate means shall be taken immediately to prevent any entry of any foreign materials into the pipe spools, until finally installed. As to the pipe spools to be stored after pre-fabrication, all open ends shall be entirely capped or sealed.