In Example 4.3-2 , suppose that TOYCO is studying the possibility of introducing a fourth toy : fire trucks. The assembly does not make use of operation 1. Its unit assembly times on operation 2 and 3 are 1 and 3 minutes , respectively. The revenue per unit is $4. Would you advise TOYCO to introduce the new product ?