Thus, if the continuous process takes half an hour and the required output is still one cubic meter per hour, a reactor whose volume is half a cubic meter will be required. Hence, the volume of the reaction systems in the batch process will be greater, and in consequence the investment in equipment will also be greater.
In general terms, a batch installation requires more manpower while a continuous installation requires greater computerized and automated control. Experience shows us that over time, an initial investment in control is more feasible that the high day-to-day costs of manpower.