Referring to ITP for Piling Work REV. B dated 23th September 2013, every pile driving must be recorded in the pile driving record by QC Staff. However, the pile driving work at HRSG Train 2 by RIG 4 on 7th March 2014 has been done without QC staff, no pile driving record. Therefore, KEGCO would like Consortium to propose the resolution of piling work to KEGCO and inspect the piling work immediately to ensure that the piling work shall be done without any problems