The initial leak tests can be performed using air or nitrogen depending upon local facilities. The test pressure will be at the air or nitrogen system pressure or at the unit (or section of unit) design pressure, whichever is the lower. For equipment in low alloy steel, the test pressure shall remain below the quarter of the design pressure of the equipment to avoid temper embrittlement.