Is material being welded as per the specification and as per fabrication drawing?
Is the joint preparation as per the approved welding procedure and drawing?
Clearances, dimensions, backing strips, backing material or gas filler metal.
Alignment, fit-up, distortion control etc
Verification of WPS/PQRs and cleanliness