Dear everybody,
Last Friday I received 2 agreements for reviewing and comments as following pls. take action of “To Do” under your responsible.
@ Engineer and Procurement team, pls. noted that most of installation, construction, etc.. are required relevant permission or license therefore pls. be inform to HR/Safety to involve all project.
I Install Raw, Waste, Reused water piping system (PO no. 57189678)
Corporate document complete.
Factory layout change => To Do: HR could you pls check this installation will change the layout that we granted permission or not? If yes , Do we need to submit the application to SAO (Subdistrict Administrative Organization) ? Or this layout change is include the new permission of OP project or not? pls. ensure our OP project granted all necessary permission correctly.
II Install Electrical Power Supply & Lighting System (PO no. 57194732)
Corporate document ,missing following documents (To Do: Procurement pls. complete asap then we will present to Mr. Doru for his authorized)
POA missing duty stamp , ID card and house registration of proxy with sign certify true copy.
No license for professional practice (electrical)
In scope of work have mention that the supplier have to change breaker, motor, gear etc.. therefore
To Do:
1. Engineer pls. give more information about control panel cabinet to Kanokwan
ð this is old or new control panel ? How much cost of old parts and new changing parts (breaker, motor, gear etc..) then will check depreciation impact or How to book replacement cost to electrical system or M/C?
ð still under warrantee or we are able to change without consent?
2. Engineer pls. give more information about OP project and all changing of factory layout to HR/Safety
=> HR/Safety pls. check all relevant authorities that all change of factory layout/structure, additional more machine HP, increasing of Kwh or change of electrical diagram from the original permission / license are required to submit any application permit or not if yes pls. take action asap to ensure our company work comply with all local rule and regulation.
Dear everybody,
Last Friday I received 2 agreements for reviewing and comments as following pls. take action of “To Do” under your responsible.
@ Engineer and Procurement team, pls. noted that most of installation, construction, etc.. are required relevant permission or license therefore pls. be inform to HR/Safety to involve all project.
I Install Raw, Waste, Reused water piping system (PO no. 57189678)
Corporate document complete.
Factory layout change => To Do: HR could you pls check this installation will change the layout that we granted permission or not? If yes , Do we need to submit the application to SAO (Subdistrict Administrative Organization) ? Or this layout change is include the new permission of OP project or not? pls. ensure our OP project granted all necessary permission correctly.
II Install Electrical Power Supply & Lighting System (PO no. 57194732)
Corporate document ,missing following documents (To Do: Procurement pls. complete asap then we will present to Mr. Doru for his authorized)
POA missing duty stamp , ID card and house registration of proxy with sign certify true copy.
No license for professional practice (electrical)
In scope of work have mention that the supplier have to change breaker, motor, gear etc.. therefore
To Do:
1. Engineer pls. give more information about control panel cabinet to Kanokwan
ð this is old or new control panel ? How much cost of old parts and new changing parts (breaker, motor, gear etc..) then will check depreciation impact or How to book replacement cost to electrical system or M/C?
ð still under warrantee or we are able to change without consent?
2. Engineer pls. give more information about OP project and all changing of factory layout to HR/Safety
=> HR/Safety pls. check all relevant authorities that all change of factory layout/structure, additional more machine HP, increasing of Kwh or change of electrical diagram from the original permission / license are required to submit any application permit or not if yes pls. take action asap to ensure our company work comply with all local rule and regulation.
การแปล กรุณารอสักครู่..

ที่รักทุกคน
วันศุกร์ที่แล้ว ผมได้รับสัญญา 2 เพื่อทบทวนและความคิดเห็นดังต่อไปนี้กรุณา ลงมือ " ทำ " อยู่ภายใต้ความรับผิดชอบ
@ วิศวกร และจัดหาทีม กรุณา สังเกตว่าส่วนใหญ่ของการติดตั้ง , ก่อสร้าง ฯลฯ จะต้องได้รับอนุญาตหรือใบอนุญาตที่เกี่ยวข้องดังนั้น pls ต้องแจ้งให้บุคคล / ความปลอดภัยที่เกี่ยวข้องกับโครงการทั้งหมด
ผมติดตั้งดิบ , ของเสียใช้ระบบท่อน้ำ ( ปอไม่ 57189678 )
องค์กรเอกสารที่สมบูรณ์
โรงงานรูปแบบเปลี่ยน = > ทำ : HR คุณช่วยกรุณาตรวจสอบการติดตั้งนี้จะเปลี่ยนรูปแบบ ที่เราได้รับอนุญาตหรือไม่ ? ถ้าใช่ เราต้องส่งใบสมัครไปที่ อบต. ( องค์การบริหารส่วนตำบล ) หรือรูปแบบนี้เปลี่ยนเป็นรวมใหม่จากโครงการ OP หรือไม่ ? กรุณาตรวจสอบโครงการที่ได้รับอนุญาตที่จำเป็นของเราให้ถูกต้อง
2 ติดตั้งไฟฟ้า ประปา ไฟฟ้า &ระบบแสงสว่าง ( ปอไม่ 57194732 )
องค์กรเอกสาร ขาดเอกสารดังต่อไปนี้ ( ต้องทำ กรุณาจัดหา เสร็จเร็วเราก็จะเสนอให้นาย doru เขาอนุญาต )
พ้อขาดอากรแสตมป์ บัตรประชาชน และทะเบียนบ้าน ของพร็อกซีกับเซ็นรับรองสำเนาถูกต้อง .
ไม่มีใบอนุญาตสำหรับการฝึกปฏิบัติงานวิชาชีพ ( ไฟฟ้า )
ในขอบเขตของงานได้กล่าวถึงว่า ซัพพลายเออร์ต้องเปลี่ยนเบรกเกอร์ , มอเตอร์ , เกียร์ ฯลฯ ดังนั้นการทำ
1 กรุณา วิศวกร ให้ข้อมูลเพิ่มเติมเกี่ยวกับแผงควบคุมตู้กนกวรรณ
ðนี้จะเก่าหรือใหม่ แผงควบคุม ? เท่าไหร่ค่าใช้จ่ายของชิ้นส่วนเก่าและใหม่ เปลี่ยนอะไหล่ ( เบรกเกอร์ , มอเตอร์ , เกียร์ ฯลฯ) แล้วจะตรวจสอบผลกระทบจากต้นทุนค่าเสื่อมราคาหรือวิธีการจองต่อระบบไฟฟ้าหรือ M / C
ðยังคงภายใต้การรับประกันหรือเราสามารถที่จะเปลี่ยนแปลงโดยปราศจากความยินยอม ?
2 กรุณา วิศวกร ให้ข้อมูลเพิ่มเติมเกี่ยวกับโครงการและโรงงาน OP เปลี่ยนรูปแบบเพื่อความปลอดภัย
= > HR / บุคคล / ความปลอดภัย pls ตรวจสอบเจ้าหน้าที่ที่เกี่ยวข้องทั้งหมดเปลี่ยนแปลงโครงสร้างผังโรงงานเพิ่มเติมอีกเครื่อง HP ,การเพิ่มหรือเปลี่ยนแปลงแผนผังไฟฟ้า ( จากเดิมอนุญาต / ใบอนุญาต จะต้องยื่นใบขออนุญาตใด ๆหรือไม่ ถ้าใช่กรุณา ดำเนินการโดยเร็ว เพื่อให้งาน บริษัท ของเราให้สอดคล้องกับท้องถิ่นและกฎระเบียบ .