Planing Work: Check Shop Dwg. Steel Door.
Rebar Work.
Rebar Slab Work., Drop Panel Work, CB Wall Toilt.
Drainge for Lab., Toilet No.2 Wiring Cuble.
Drawing Electrical and Integument Check.
Install Drain Pipe PVC at Kitchen Room.
Check Bolt Foundation.
Safety control Site and Safety Patrol.
Install Steel Bar G-Slab. Temp. Scaffolding Utility Bldg.
Casting Concrete Road.
Casting Concrtet Road.
Line . Level Road.
Shop DWG. LPG Yard Rev.Shop DWG.
Shop DWG. Document and Summery Concrete.
Document Work: Invoice and Po.Spot.