Policy & Standard
General Manager and Department Heads must be informed properly for the power cut schedules ahead of time and letting them to prepare the necessary measures.
Procedure
When the power supplier informs the Hotel (or engineering staff) to examine a power cut of the electrical circuits, the following procedures must be executed.
1. Duty Engineers on duty must be familiar of the areas of light and equipment due for examination, and log in the operation logbook for documentation.
2. As for the scope of power cut for lights and equipment, engineering staff should set up a schematic diagram of the back- up power supply, before switch off the affected Electrical Circuits.
3. Keep department concerned informed, such as IT office, in order to avoid possible negative effect in cut - off the power.
4. If Power cut is over, it has to be reported by telephone as soon as possible