Hi YP – Thanks.
1. I checked the drawings, and made a comment in red – please always cloud in black, the revisions and add the delta 1. (triangle shape) as part of the cloud.
2. Amp will complete the spec sheets for 10-811 @ WC, and then You will need to send these plans to Neal too.
3. I notice that we have not issued the whole package of plans and all the FF&E items to Savio – this link was prepared from yesterday – has it been sent to RF for his cover note?