SCOPE OF WORK
1. DEMOLITION OF WALL FOR NEW DOOR AND WINDOW
2. INSTALL NEW 500 X 500 MM. FLOORING CARPET TILE
AND APPLY 100 H. ALUMINUM SKIRTING TO ALL WALL
3. BUILD UP GYPSUM WALL WITH 25 MM. GLASS-WOOL
INSULATION
4. SUPPLY AND INSTALL NEW FULL HEIGHT WHITE BOARD
PANEL AS INDICATED IN THE DRAWING
5. INSTALL NEW TEMPERED GLASS DOOR
6. INSTALL NEW WINDOW
7. SUPPLY AND INSTALLATION OF NEW FURNITURE
8. INSTALL NEW 600 x 600 MM. ACOUSTIC CEILING TILE
9. MODIFICATION MECHANICAL AND ELECTRICAL SYSTEM
10. INSTALL NEW SPLIT TYPE A/C UNITS
11. INSTALLATION OF LAN JUNCTION BOX
12. INSTALLATION OF LAN OUTLETS FOR WIFI ROUTER (ROUTER