4.2 Implementation
(1) The first DFMEA shall be implemented prior to the DR (SASG: K12-01A) for development trial production 1 (manufacturing arrangement for initial development trial production).
(2) The DFMEA shall be completed prior to the DR for production trial 1 (manufacturing arrangement of first trial production) fixing the matters that results of recommended actions were not obtained by the first time DFMEA, and including the results of recommended actions for the matters that were added through reviewing after the first time DFMEA.
(3) In case there is no recommended action, “None“shall be entered into the allotted space for